Second Brain
Search
Search
Dark mode
Light mode
Explorer
Tag: r-dash
13 items with this tag.
May 04, 2026
encouraging-not-daunting-ui-design-dna-for-every-aj-owned-pr
ui
ux
design-philosophy
r-plan
r-dash
r-taskflow
anti-slop
Apr 26, 2026
Adopt the R-Dash W7-W12 upgrade plan as the active roadmap for elevati…
runwal
architecture
partially_reversible
r-dash
upgrade
st-derived
auto-mirrored
Apr 26, 2026
CONFIRMED via reasoning-chain audit: adopt R-Dash W7-W12 upgrade plan…
runwal
architecture
partially_reversible
r-dash
upgrade
st-derived
auto-mirrored
Apr 26, 2026
Per AJ god-grade directive (2026-04-26): collapse the 5-PR Stage 0 seq…
runwal
r-dash
architecture
upgrade
god-grade
partially_reversible
urgent
st-derived
auto-mirrored
20/21
Apr 17, 2026
R-Dash Architecture Freeze (Checkpoint 2)
architecture
r-dash
helix-phased
checkpoint-2
layer-2
stack-selection
data-model
api-contract
auth-model
tenancy
Apr 17, 2026
R-Dash Auth Amendment — Local Auth v1 (Azure AD SSO Deferred)
architecture
r-dash
auth
amendment
supersede
layer-2
local-auth
Apr 17, 2026
R-Dash Design Direction Freeze (Checkpoint 3)
frontend-aesthetic
r-dash
helix-phased
checkpoint-3
layer-3
minimalist
linear-reference
tailwind-v4
Apr 17, 2026
R-Dash Rename (R-Same → R-Dash) + GitHub Transfer (ARJ-TECH → ARJ999)
r-dash
rename
github-transfer
adr-0008
law-2-zero-ambiguity
layer-4
Apr 17, 2026
R-Dash Requirements Freeze (Checkpoint 1)
requirements
r-dash
helix-phased
checkpoint-1
bi-platform
runwal
layer-1
Apr 17, 2026
R-Dash Wave 1 CODE-COMPLETE — Closeout + Bug-Catch
r-dash
wave-1
closeout
integration-tests
openapi
runbooks
bug-caught
layer-4
Apr 17, 2026
R-Dash Wave 2 CODE-COMPLETE — Closeout
r-dash
wave-2
code-complete
rls-contract
cube-client
column-mask
integration-tests
layer-4
Apr 17, 2026
R-Dash Wave 2 Pass 1 — M4 Semantic + M5 Governance Models + RLS Engine
r-dash
wave-2
m4-semantic
m5-governance
rls
policy-engine
cube-js
tableau-reference
layer-4
Apr 17, 2026
R-Dash Wave 2 Pass 2 — M4/M5 Routes + First RLS Contract Test (J3 First Instance)
r-dash
wave-2
m4-semantic
m5-governance
rls-contract-test
j3-achieved
ci-gate
layer-4